Project Name:  
Enter a Project Name. This will be displayed in the estimation report.
 
Company Information:   Notes:    
 
Enter any relavent notes
 
Company:  
Enter Information in the following text boxes. This will be displayed in the estimation report.
   
Name:      
Address:      
City:      
Country:      
Tel No:      
Email:      
   
Prepared By:      
   
Email:    
Click reset to load default data and clear Customer Information.

Click Print to print out current tab.

PENZ
 
                           
           
           
           
           
           
           
Operation Time:   VSD Data:   Total Hours/Year: Hours
           
Hours per Day:
Hours   VSD Efficiency:
97% typical for VSD only. If Freemaq filter installed adjust to suit.

 
Days per Week:
Days   VSD Cost:                  $
Enter the VSD Cost (must be greater than 0)
   
Weeks per Year:
Weeks      
Cost per KWh:
Cents      
AC Motor Data:   Soft Starter Data:  
        (For payback comparison)  
Motor Power:
KW   SS Efficiency:
99% typical for Soft Starter
%  
Motor Efficiency:
95% typical
%   SS Cost:                  $
Enter the SS Cost (used for payback comparison assuming a SS would be installed if not using a VSD. Enter 0 if not used.
 
Click reset to load default data and clear Customer Information.

Click Print to print out current tab.


PENZ
 
               
                                         
   
   
   
   
   
   
Enter the percentage time for each of the flow rates
Flow Rate %:
 
  100%
%    
  90%
%    
  80%
%    
  70%
%    
  60%
%    
  50%
%    
  40%
%    
  30%
%    
  20%
%    
  10%
%    
 
  Total:
Total must equal 100% for valid Estimation
%  
   
Click reset to load default data and clear Customer Information.

Click Print to print out current tab.


PENZ
 
   
                           
 
 
 
 
  To:    
      Energy Estimator Report  
       
       
       
         
       
  Centrifugal Fan Application   Project Name:  
  Total Hours of Operation: Hours       Duty Cycle    
  Costs/Motor/VSD Data         % Flow Time (Hrs) Time (%)    
  Cost / KWh:   Cents/KWh     100    
  Motor Power:   KW       90    
  Motor Efficiency:   %       80    
  VSD Efficiency:   %       70    
  VSD Cost:             60    
  Annual Cost Per Control Method:           50    
  No Speed Control:   (50hz Fixed Speed, 100% Flow)   40    
  VSD:         30    
  Outlet Damper Control:         20    
  Inlet Vane Control:           10    
  Annual Savings Using VSD Versus:     Payback Time VSD Versus: (Includes SS Cost)            
  No Speed Control:     No Speed Control:   Years      
  Outlet Damper Control:     Outlet Damper Control: Years      
  Inlet Vane Control:     Inlet Vane Control:     Years      
  Cost Breakdowns:                      
  Variable Speed Drive     Outlet Damper Control Inlet Vane Control  
  Flow Time % Hrs/Year KW $/Hr Cost/Year     KW Cost/Year   KW Cost/Year  
  100        
  90        
  80        
  70        
  60        
  50        
  40        
  30        
  20        
  10        
  Air       Total     Total   Total  
 
Click reset to load default data and clear Customer Information.

Click Print to print out current tab.


PENZ